Chrome Tailings Facility Design
Geotheta completed a design of a new chrome tailings facility near Rustenburg.
The work included stability assessment of the existing TSF, design of a rock buttress to increase the facility factors of safety and gain about 2.5 years more capacity, design of the new facility, return water dam and extensions to the waste rock dump.
Related News
Underground Basement Design
An underground basement was designed for an existing structure in Glenvista south of Johannesburg. The existing structure is three stories high, and the underground basement has been designed so that…
Geotheta Appointed Representative Engineer
Geotheta was appointed as a client representative engineer for two pollution control dams near Ogies in Mpumalanga. These facilities were recently commissioned with no issues. The liner covering was re-designed…
Geotheta Appointed Representative Engineer
Geotheta was appointed as a client representative engineer for two pollution control dams near Ogies in Mpumalanga. These facilities were recently commissioned with no issues. The liner covering was re-designed…